1510.08 COMPREHENSIVE STORM WATER MANAGEMENT PLANS.
   (a)   Comprehensive Stormwater Management Plan Required: The owner applicant shall develop a Comprehensive Stormwater Management Plan describing how the quantity and quality of stormwater will be managed after construction is completed for every discharge from the site and/or into a water resource or small municipal separate storm sewer system (MS4). The Plan will illustrate the type, location, and dimensions of every structural and non-structural SCM incorporated into the site design, and the rationale for their selection. The rationale must address how these SCMs will address flooding within the site as well as flooding that may be caused by the development upstream and downstream of the site. The rationale will also describe how the SCMs minimize impacts to the physical, chemical, and biological characteristics of on-site and downstream water resources and, if necessary, correct current degradation of water resources that is occurring or take measures to prevent predictable degradation of water resources.
 
   (b)   Preparation by Professional Engineer: The Comprehensive Stormwater Management Plan shall be prepared by a Registered Professional Engineer and include supporting calculations, plan sheets, and design details. To the extent necessary, as determined by the City Engineer, a site survey shall be performed by a Registered Professional Surveyor to establish boundary lines, measurements, or land surfaces.
 
   (c)   Community Procedures: The City Engineer shall prepare and maintain procedures providing specific criteria and guidance to be followed when designing the stormwater management system for the site. These procedures may be updated from time to time, at the discretion of the City Engineer based on improvements in engineering, science, monitoring, and local maintenance experience. The City Engineer shall make the final determination of whether the SCMs proposed in the Comprehensive Stormwater Management Plan meet the requirements of this regulation. The City Engineer may also maintain a list of acceptable SCMs that meet the criteria of this regulation to be used in the City of Pepper Pike.
 
   (d)   Contents of Comprehensive Stormwater Management Plan: The Comprehensive Stormwater Management Plan shall contain an application, narrative report, construction site plan sheets, a long-term Inspection and Maintenance Plan and a long-term Inspection and Maintenance Agreement, and a site description with the following information provided:
      (1)   Site description:
         A.   A description of the nature and type of the construction activity (e.g. residential, shopping mall, highway, etc.).
         B.   Total area of the site and the area of the site that is expected to be disturbed (i.e. grubbing, clearing, excavation, filling or grading, including off-site borrow areas).
         C.   A description of prior land uses at the site.
         D.   An estimate of the impervious area and percent of imperviousness created by the soil-disturbing activity at the beginning and at the conclusion of the project.
         E.   Existing data describing the soils throughout the site, including the soil series and association, hydrologic soil group, porosity, infiltration characteristics, depth to groundwater, depth to bedrock, and any impermeable layers.
         F.   If available, the quality of any known pollutant discharge from the site such as that which may result from previous contamination caused by prior land uses.
         G.   The location and name of the immediate water resource(s) and the first subsequent water resource(s).
         H.   The aerial (plan view) extent and description of water resources at or near the site that will be disturbed or will receive discharges from the project.
         I.   If applicable, identify the point of discharge to a municipal separate storm sewer system and the location where that municipal separate storm sewer system ultimately discharges to a stream, lake, or wetland. The location and name of the immediate receiving stream or surface water(s) and the first subsequent receiving water(s) and the aerial extent and description of wetlands or other special aquatic sites at or near the site which will be disturbed or which will receive discharges from undisturbed areas of the project.
         J.   TMDLs applicable for the watershed that the construction site is located in has to demonstrate that the appropriate SCMs have been selected to address the TMDLs for that watershed. The TMDL information for all watersheds in the State of Ohio can be found on the Ohio EPA Nonpoint Source Pollution Control Program Website.
         K.   Describe the current condition of water resources including the vertical stability of stream channels and indications of channel incision that may be responsible for current or future sources of high sediment loading or loss of channel stability.
      (2)   Site map showing:
         A.   Limits of soil-disturbing activity on the site.
         B.   Soils types for the entire site, including locations of unstable or highly erodible soils.
         C.   Existing and proposed one-foot (1') contours. This must include a delineation of drainage watersheds expected before, during, and after major grading activities as well as the size of each drainage watershed in acres.
         D.   Water resource locations including springs, wetlands, streams, lakes, water wells, and associated setbacks on or within 200 feet of the site, including the boundaries of wetlands or streams and first subsequent named receiving water(s) the owner intends to fill or relocate for which the owner is seeking approval from the Army Corps of Engineers and/or Ohio EPA.
         E.   Existing and planned locations of buildings, roads, parking facilities, and utilities.
         F.   The location of any in-stream activities including stream crossings.
      (3)   Contact information: Company name and contact information as well as contact name, addresses, and phone numbers for the following:
         A.   The Professional Engineer who prepared the Comprehensive Stormwater Management Plan.
         B.   The site owner.
      (4)   Phase, if applicable, of the overall development plan.
      (5)   List of sublot numbers if project is a subdivision.
      (6)   Ohio EPA NPDES Permit Number and other applicable state and federal permit numbers, if available, or status of various permitting requirements if final approvals have not been received.
      (7)   Location, including complete site address and sublot number if applicable.
      (8)   Location of any easements or other restrictions placed on the use of the property.
      (9)   A site plan sheet showing:
         A.   The location of each proposed post-construction SCMs.
         B.   The geographic coordinates of the site AND each proposed SCM in North American Datum Ohio State Plane North.
It is preferred that the entire site be shown on one plan sheet to allow a complete view of the site during plan review. If a smaller scale is used to accomplish this, separate sheets providing an enlarged view of areas on individual sheets should also be provided.
      (10)   Inspection and Maintenance Agreement. The Inspection and Maintenance Agreement required for SCMs under this regulation as a stand-alone document between the City of Pepper Pike and the owner. A copy of this agreement should be attached to the property deed. The agreement shall contain the following information and provisions:
         A.   Identification of the landowner(s), organization, or municipality responsible for long-term inspection and maintenance, including repairs, of the SCMs.
         B.   The landowner(s), organization, or municipality shall maintain SCMs in accordance with this regulation.
         C.   The City of Pepper Pike has the authority to enter upon the property to conduct inspections as necessary, with prior notification of the property owner, to verify that the SCMs are being maintained and operated in accordance with this regulation.
         D.   The City of Pepper Pike shall maintain public records of the results of site inspections, shall inform the landowner(s), organization, or municipality responsible for maintenance of the inspection results, and shall specifically indicate in writing any corrective actions required to bring the SCMs into proper working condition.
         E.   If the City of Pepper Pike notifies the landowner(s), organization, or municipality responsible for maintenance of the maintenance problems that require correction, the specific corrective actions shall be taken within a reasonable time as determined by the City of Pepper Pike.
         F.   The City of Pepper Pike is authorized to enter upon the property and perform the corrective actions identified in the inspection report if the landowner(s), organization, or municipality responsible for maintenance does not make the required corrections in the specified time period. The City of Pepper Pike shall be reimbursed by the landowner(s), organization, or municipality responsible for maintenance for all expenses incurred within 10 days of receipt of invoice from the City of Pepper Pike, or more with written approval from the City of Pepper Pike engineer.
         G.   The method of funding long-term maintenance and inspections of all SCMs.
         H.   A release of the City of Pepper Pike from all damages, accidents, casualties, occurrences, or claims that might arise or be asserted against the City of Pepper Pike from the construction, presence, existence, or maintenance of the SCMs.
      (11)   Inspection and Maintenance Plan. This plan will be developed by the applicant and reviewed by the City of Pepper Pike. Once the Inspection and Maintenance Plan is approved, a recorded copy of the Plan must be submitted to the City of Pepper Pike as part of the final inspection approval as described in Section 1510.12. The plan will include at a minimum:
         A.   The location of each SCM and identification of the drainage area served by each SCM.
         B.   Photographs of each SCM, including all inlets and outlets upon completion of construction.
         C.   Schedule of inspection.
         D.   A schedule for regular maintenance for each aspect of the stormwater management system and description of routine and non-routine maintenance tasks to ensure continued performance of the system as is detailed in the approved Comprehensive Stormwater Management Plan. A maintenance inspection checklist written so the average person can understand it shall be incorporated. The maintenance plan will include a detailed drawing of each SCM and outlet structures with the parts of the outlet structure labeled. This schedule may include additional standards, as required by the City of Pepper Pike Engineer, to ensure continued performance of SCMs permitted to be located in, or within 50 feet of, water resources. The location and documentation of all access and maintenance easements on the property. Alteration or termination of these stipulations is prohibited.
      (12)   Required calculations: The owner shall submit calculations for projected stormwater runoff flows, volumes, and timing into and through all SCMs for flood control, channel protection, water quality, and the condition of the habitat, stability, and incision of each water resource and it's the floodplain, as required in Section 1510.09 of this regulation. These submittals shall be completed for both pre- and post-development land use conditions and shall include the underlying assumptions and hydrologic and hydraulic methods and parameters used for these calculations. The owner shall also include critical storm determination and demonstrate that the runoff from offsite areas have been considered in the calculations.
      (13)   List of all contractors and subcontractors before construction: Prior to construction or before the pre-construction meeting, provide the list of all contractors and subcontractors and their names, addresses, and phones involved with the implementation of the Comprehensive Stormwater Management Plan including a written document containing signatures of all parties as proof of acknowledgment that they have reviewed and understand the requirements and responsibilities of the Comprehensive Stormwater Management Plan.
      (14)   Existing and proposed drainage patterns: The location and description of existing and proposed drainage patterns and SCMs, including any related SCMs beyond the development area and the larger common development area.
      (15)   For each SCM to be employed on the development area, include the following:
         A.   Location and size, including detail drawings, maintenance requirements during and after construction, and design calculations, all where applicable.
         B.   Final site conditions including stormwater inlets and permanent nonstructural and structural SCMs. Details of SCMs shall be drawn to scale and shall show volumes and sizes of contributing drainage areas.
         C.   Any other structural and/or non-structural SCMs necessary to meet the design criteria in this regulation and any supplemental information requested by the City Engineer.
         D.   Each SCM shall be designated with an individual identification number.
(Ord. 2017-36. Passed 11-15-17.)