The permit fee shall be $15 for the cost of each inspection. A single excavation shall be deemed to constitute all the digging necessary for a single connection, or a cut for installing a main not exceeding 100 feet in length. An additional fee of $15 shall be required for every additional 100 feet, or major fraction thereof, of main excavation.
(Prior Code, § 6-6-2)