§ 52.40 FAILURE OF METER.
In any case where a meter fails, the utility may bill consumption based on the average of billings for the last six months prior to the month in which the meter failed.
('82 Code, § 36-9-2-1(i)) (Ord. passed 12-10-57; Am. Ord. passed 11-22-68; Am. Ord. passed 4-13-76; Am. Ord. passed 5-18-82)