§ 154.78 DISPOSITION OF EXCAVATED MATERIALS.
   Broken pavement and other debris shall be removed from the site as soon as practical, unless otherwise directed by the Engineering Department. Excavated materials shall not be stockpiled in the rights-of-way during construction without specific approval of the Engineering Department. All excess material shall be removed from the work site and disposed of legally at the permittee's expense.
(Ord. 972, passed 11-6-91; Am. Ord. 2021-02, adopted 3-17-21; sought to be reconsidered, Commission passed 4-21-2021)