Unless otherwise provided for by state law, permit fees shall be as follows:
(A) The permit fee to open cut road in dedicated public rights-of-way shall be $100 per linear foot of the open cut of the pavement.
(B) Permit fee to dig trenches, pits, ditches and other excavation operations outside the roadway pavement to install or repair utility lines, or to install pipe underneath the roadway by bore and jack method shall be as follows:
Linear Feet | Cost |
0 - 100 | $100 |
101 - 500 | 200 |
501 - 1,000 | 250 |
over 1,000 | 250 plus .10 per linear feet over 1,000 linear feet |
(Ord. 972, passed 11-6-91; Am. Ord. 2021-02, adopted 3-17-21; sought to be reconsidered, Commission passed 4-21-2021)