(A) A permit is required for all excavation operations in public rights-of-way or ingress/egress easements dedicated for the use of pedestrian and vehicular traffic, such permits shall only be issued by the Engineering Department. The permit shall expire if permitted work is not commenced within 90 calendar days.
(B) No excavation shall be started until a permit for the proposed installation has been granted by the Engineering Department. Violation of this subchapter shall be punishable as provided in § 154.99.
(C) Permits will not be required for work inside of existing manholes.
(Ord. 972, passed 11-6-91; Am. Ord. 2021-02, adopted 3-17-21; sought to be reconsidered, Commission passed 4-21-2021)