§ 152.91 POLICIES.
   (A)   Erosion control for drainage channels in all new developments shall conform with §§ 152.110 - 152.131.
   (B)   Assessment of erosion hazards shall be performed for all proposed development adjacent to alluvial (i.e. sand and gravel bed) watercourses within the town.
   (C)   Adequate building setbacks shall be established or bank stabilization measures shall provide for all development along alluvial watercourses.
   (D)   A minimum building setback of ten feet applies to all channel banks and floodways. The Public Works Engineer, based on application of structural erosion control measures, may grant exceptions.
(Res. 1637, passed 2-28-02)