8-18-10: STRUCTURAL DESIGN AND ENVIRONMENTAL STANDARDS:
   A.   Tower, Antenna And Facilities Requirements: All telecommunication facilities shall be designed to blend into the surrounding environment to the greatest extent feasible. To this end, all of the following measures shall be implemented:
      1.   All telecommunication facilities shall comply at all times with all federal communication commission (FCC) rules, regulations, and standards. To that end no telecommunication facility or combination of facilities shall produce at any time power densities in any inhabited area that exceed the federal communication commission (FCC) adopted standard for human exposure, as amended, or any more restrictive standard subsequently adopted or promulgated by the federal government. All telecommunication towers and antennas shall meet or exceed the standards and regulations in place at the time of the issuance of the special use permit, of the federal aviation administration (FAA), the Idaho state bureau of aeronautics, occupational safety and health association (OSHA), the federal communication commission (FCC) and authority to regulate towers and antennas.
      2.   Telecommunication towers shall be constructed out of metal or other nonflammable material, unless specifically permitted for monopole applications.
      3.   All ground mounted telecommunication towers shall be self- supporting monopoles or lattice towers except where satisfactory evidence is submitted to the planning and zoning commission that a guyed tower is required.
      4.   Satellite dish and parabolic antennas shall be situated as close to the ground as possible to reduce visual impact without compromising their function.
      5.   Telecommunication support facilities (e.g., equipment rooms, utilities, and equipment enclosures) shall be constructed out of nonreflective materials (visible exterior surfaces only). Telecommunication support facilities shall be no taller than one story fifteen feet (15') in height, measured from the original grade at the base of the facility to the top of the structure, and shall be designed to blend with existing architecture in the area or shall be screened from sight by mature landscaping, and shall be located or designed to minimize their visibility.
      6.   Telecommunications towers, facilities and antennas shall be designed and constructed in accordance with the uniform building code and other applicable state and federal requirements.
      7.   The maximum height of an antenna platform located on a rooftop shall be twenty feet (20') above the roof.
      8.   Telecommunication facilities shall not interfere with or obstruct existing or proposed public safety, fire protection or supervisory controlled automated data acquisition (SCADA) operation telecommunication facilities. The applicant, at no cost to the county, shall correct any actual interference and/or obstruction.
   B.   Height: The height of a telecommunication tower shall be measured from the original grade at the base of said tower to the highest part of the tower itself. In the case of building mounted towers the height of the tower includes the height of the portion of the building on which it is mounted. In the case of "crankup" or other similar towers whose height can be adjusted, the height of the tower shall be the maximum height to which it is capable of being raised.
   C.   Lighting: Telecommunication towers shall not be artificially lighted unless required by the federal aviation administration (FAA) or other applicable regulatory authority. When required by the FAA, white strobe lights during the day will be permitted with red flashing lights required from dusk to dawn.
   D.   Site Development, Roads And Parking:
      1.   A leased parcel intended for the location of new telecommunication towers and associated structures shall maintain a minimum parcel size of two thousand five hundred (2,500) square feet. The Minidoka County planning and zoning commission may modify the leased parcel size requirement after public hearing and review.
      2.   A parcel owned by the telecommunication carrier and/or provider and intended for the location of new telecommunication towers and equipment buildings shall meet the minimum size requirement of the ordinance.
      3.   All sites must be served by a minimum thirty foot (30') wide easement with a turnaround. The Minidoka County planning and zoning commission may modify the easement and turnaround requirement after public hearing and review. All sites shall use existing access points and roads whenever possible. The respective county highway district or the applicable road jurisdiction shall approve the access point to the site.
   E.   Vegetation Protection And Facility Screening:
      1.   All telecommunications facilities shall be installed in such a manner so as to minimize disturbance to existing native vegetation and shall include suitable mature landscaping to screen the facility, where necessary to be compatible with adjoining and surrounding areas. For purposes of this section, "mature landscaping" shall mean trees, shrubs or other vegetation of a size that will provide the appropriate level of visual screening.
      2.   Upon project completion, the owner(s)/operator(s) of the facility shall be responsible for maintenance and replacement of all required vegetation and landscaping.
      3.   Facility structures and equipment, including supporting structures, shall be located, designed and screened to blend with the existing natural or built surroundings, so as to reduce visual impacts.
   F.   Fire Prevention: All telecommunication facilities shall be designed and operated in accordance with all applicable codes regarding fire prevention.
   G.   Noise And Traffic: All telecommunication facilities shall be constructed and operated in such a manner as to minimize the amount of disruption caused to nearby properties. To that end all the following measures shall be implemented for telecommunication facilities:
      1.   Noise producing construction activities shall only take place on weekdays (Monday through Saturday, nonholiday) between the hours of six o'clock (6:00) A.M. and six o'clock (6:00) P.M., except in times of emergency repair.
      2.   Backup generators shall only be operated during power outages and for testing and maintenance purposes. (Ord. 411, 8-14-2002)