§ 150.146 REQUIRED INSPECTIONS.
   All permits require certain inspections. Below are the required inspections. After an owner/builder/ contractor requests an inspection, the City Building Inspector or his or her designee will make the requested inspection within 48 hours. Should additional inspections be required, the owner/building/contractor will be assessed a fee as set out in the Fee and Permit Schedule found in Appendix "A" of this chapter, for each additional inspection until the original requested inspection is satisfactory.
(Ord. 2015-3, passed 5-7-2015)