§ 200.04 METER INSTALLATION RATES.
   (A)   Each residential applicant shall be charged for the tap, meter, backflow prevention device, meter service box and for installation of the meter. Rates for residential meter installations for all meter sizes will be set as follows:
 
FY 24-25
5/8 x 3/4" Meter1
$812.42
5/8 x 3/4" Meter (w/double check; residential only)
$851.28
1" Meter1
$925.21
1 1/2" Meter1
$1,317.70
2" Meter1
$1,657.33
 
1Owner provided backflow requirements may apply.
   (B)   Each new subdivision development applicant shall be charged for the meter, backflow prevention device, meter service box and for installation of the meter. Rates for new subdivision development meter installations for all meter sizes will be set as follows:
 
FY 24-25
5/8 x 3/4" Meter1
$433.30
5/8 x 3/4" Meter (w/double check; residential only)
$472.81
1" Meter1
$546.72
1 1/2" Meter1
$939.23
2" Meter1
$1,279.49
 
1Owner provided backflow requirements may apply.
   (C)   The meter charge for commercial development (without installation provided) will be set as follows:
 
FY 24-25
5/8 x 3/4" Meter1
$342.81
1" Meter1
$415.46
1 1/2" Meter1
$676.70
2" Meter1
$846.20
 
1Owner provided backflow requirements may apply.
   (D)   Fire Line Meter Installation:
 
FY 24-25
1" ULFM Fire Service MACH10 Meter
$633.72
1" 950XL3 Double Check Backflow Preventer
$183.40
1-1/2" ULFM Fire Service MACH10 Meter
$1,068.05
1-1/2" 950XL3 Double Check Backflow Preventer
$358.00
 
   (E)   Service charges for connections requiring a meter greater than two-inch (2") will be based on the actual cost of materials, labor, and overhead as determined by the City. A customer may elect to purchase their meter if the required meter's size exceeds two inches (2") provided that such meter must be approved by the City prior to installation.
   (F)   To the extent a change in service installation is required in order to provide the customer utility service, the cost of such installation, including the installation of the water meter will be based on the actual cost of installation, regardless of meter size as determined by the City. In no event will such cost be less than the current prevailing rates for meter installations.
(Ord. 2008-31, passed 5-1-08; Am. Ord. 2009-40, passed 10-1-09; Am. Ord. 2011-22, passed 3-17-11; Am. Ord. 2011-49, passed 9-22-11; Am. Ord. 2012-25, passed 9-18-12; Am. Ord. 2013-47, passed 9-25-13; Am. Ord. 2014-42, passed 9-25-14; Am. Ord. 2015-47, passed 9-24-15; Am. Ord. 2016-63, passed 9-22-16; Am. Ord. 2017-58, passed 9-19-17; Am. Ord. 2018-37, passed 9-18-18; Am. Ord. 2019-62, passed 11-21-19; Am. Ord. 2020-59, passed 9-23-20; Am. Ord. 2021-61, passed 9-22-21; Am. Ord. 2022-96, passed 9-21-22; Am. Ord. 2023-86, passed 9-20-23; Am. Ord. 2024-49, passed 10-1-24)