§ 202.08 DESIGN AND CONSTRUCTION OF NEW RECLAIMED WATER FACILITIES.
   (A)   All reclaimed water facilities shall be designed and constructed in accordance with applicable state, county, and City policies, standards and specifications including, but not limited to, the Palm Bay Utilities Policies, Procedures, and Standards Handbook, which by this reference is hereby incorporated into and made an integral part hereof as if fully set forth herein.
   (B)   The applicant shall design, permit and construct, at the applicant's expense, the off-site reclaimed water mains, valves and accessories necessary to extend reclaimed water service to the development as set forth in Chapter 200 of this Code.
   (C)   The applicant shall design, permit and construct, at the applicant's expense, the reclaimed water distribution system to provide reclaimed water service to individual customers within the development as set forth in Chapter 200 of this Code.
   (D)   All new development with property boundaries within two hundred fifty (250) feet of reclaimed water service lines shall be required to connect to reclaimed water service.
   (E)   All new residential subdivisions of seven (7) platted lots or greater; multi-family development of twenty-five (25) dwelling units or greater; planned unit developments; and planned commercial developments shall include master irrigation systems for common areas to allow for the future connection to reclaimed water. The master irrigation well shall be placed within two hundred fifty (250) feet of the public rights-of-way to facilitate the future connection to reclaimed water. Should the property be located on two (2) public roadways, the master irrigation well shall be located within two hundred fifty (250) feet of the roadway with the greater level of service unless otherwise directed by the Palm Bay Utilities Department Director or designee.
(Ord. 95-35, passed 8-24-95; Am. Ord. 2008-33, passed 5-1-08; Am. Ord. 2009-42, passed 10-1-09; Am. Ord. 2016-73, passed 11-17-16)