§ 94.081 BACKFILLING REQUIRED.
   All such branch gas, water and sewer lines shall be constructed in accordance with the specifications and requirements of the city and the excavations shall be backfilled so as to prevent settlement to the satisfaction of the City Engineer.
(1992 Code, § 625:20) Penalty, see § 94.999