(A) An electrical permit shall be obtained for:
(1) Construction of new Class 1 structures, Class 2 structures, and agricultural buildings;
(2) Construction of additions to Class 1 and Class 2 structures;
(3) Construction of accessory structures and additions to accessory structures, when electrical wiring, devices or equipment are installed;
(4) Class 1 structure interior renovations;
(5) Upgrade of service, installation of new service entrance conductor, or relocation of service entrance conductor;
(6) Temporary service connection;
(7) Connection of service to a manufactured or mobile home;
(8) Replacement of service panel;
(9) Installation of a generator which connects directly to the electrical utility.
(B) Any proposed structure utilizing an existing foundation shall be permitted as new construction and not as an addition or renovation project.
(Ord. 2021-0609C, passed 6-9-2021)