BUILDING REQUIREMENTS
PD-1 Retail Office | PD-2 Limited Retail Office | PD-3 Mixed- Use/Hotel | PD-4 Mixed- Use | PD-5 Residential | PD-6 Open Space/ Conservation | |
Maximum building footprint | NA | 30,000 | 30,000 | 100,000 | NA | NA |
Maximum Tenant Footprint (SF) | 50,000 (i) | 15,000 | 30,000 | 30,000 | NA | NA |
Maximum Building Height above grade (in feet (ii)) | 45 | 45 | 45/72(iii) | 45/72 (iv) | 45 | NA |
Maximum building lot coverage | NA | 35% | 35% | 35% | NA | NA |
Maximum Density | NA | NA | NA | NA | 10/acre | NA |
Minimum Previous Surface Area | 10% (v) | 30% | 20% | 20% | 50% | 100% |
Notes to Schedule 1175.06(a) (i) In addition to tenants that do not exceed the maximum tenant footprint in the PD-1 Sub-District, one tenant in the PD-1 Sub-District may have a maximum tenant footprint of 100,000 SF and one tenant in the PD-1 Sub-District may have a maximum tenant footprint of 80,000 SF. (ii) Additional height above one floor is only permitted when in compliance with the screening requirements for PD-6 in Section 1175.07. (iii) The maximum building height in Sub-District PD-3 may be increased to 72 feet for a building containing a movie theater and may be increased to 50 feet for a hotel. (iv) The maximum building height in Sub-District PD-4 may be increased to 72 feet for a building containing a movie theater when the building is a minimum of 300 feet from the boundary of Sub-District PD-6 and the buffer/screening complies with Section 1175.07. (v) In addition to the required 10% pervious surface area, the main parking lot of Sub-District PD-1 shall also incorporate two rows of "diamond shaped" planting areas, from the north end to the south end, as illustrated on the preliminary site plan in the PDP with the further purpose of breaking up the large expanse of the parking area without materially resulting in a reduction in the number of parking spaces or a reduction in the building floor area. |
(b) Schedule 1175.06(b) sets for the requirements for building and parking setbacks.