CHAPTER 1470
Controlling Riparian Setbacks and Wetlands Setbacks
1470.01   Community.
1470.02   Comprehensive Storm Water Management Plan.
1470.03   Purpose and scope.
1470.04   Disclaimer of liability.
1470.05   Conflicts, severability, nuisances and responsibility.
1470.06   Effective date.
1470.07   Scope.
1470.08   Consultations.
1470.09   Riparian and wetland setback requirements.
1470.10   Establishment of designated watercourses and riparian setbacks.
1470.11   Establishment of wetland setbacks.
1470.12   Procedure for wetland setbacks.
1470.13   Uses permitted in riparian and wetland setbacks.
1470.14   Uses prohibited in riparian and wetland setbacks.
1470.15   Nonconforming structures or uses in riparian and wetland setbacks.
1470.16   Variances within riparian and wetland setbacks.
1470.17   Boundary interpretation and appeals procedure.
1470.18   Inspection of riparian and wetland setback.
1470.19   Violations.
1470.20   Definitions.
1470.99   Penalty.
 
 
CROSS REFERENCES
Construction site soil erosion, sediment and other wastes and storm water runoff - see B. & H. Ch. 1469