§ 50.117 INSPECTIONS.
   (A)   Any construction/demolition debris landfill, whether permitted or not, may be inspected by the Solid Waste Coordinator in accordance with § 50.165.
   (B)   In addition, the following mandatory inspection criteria will apply.
      (1)   Liner. The Solid Waste Coordinator shall inspect the liner, testing data and bearing layer when it is completed. The liner shall be inspected for completeness and permeability. The Solid Waste Coordinator shall respond to a request for an inspection of the liner system within two working days of the request. If the Solid Waste Coordinator fails to inspect within two working days, the permittee may proceed to the next phase of construction, after submitting certification from a registered professional engineer that construction has been completed in accordance with the applicable requirements of this chapter and permit conditions. In addition, the permittee must provide proof of guarantee as per § 50.120.
      (2)   Leachate collection system. The Solid Waste Coordinator shall inspect the leachate collection system when it is completed. The leachate collection system shall be inspected for completeness and workmanship. The inspection shall take place before trenches and excavations are backfilled. The Solid Waste Coordinator shall respond to a request for an inspection of the leachate collection system within two working days of the request. If the Solid Waste Coordinator fails to inspect within two working days, the permittee may proceed to the next phase of construction, after submitting certification from a registered professional engineer that construction has been completed in accordance with the applicable requirements of this chapter and permit conditions.
      (3)   Final inspection. The Solid Waste Coordinator shall inspect the CDDL when it is completed. The inspection will focus on the integrity of the cap and stormwater diversion system as well as any other feature associated with the CDDL. The CDDL shall be considered closed following approval of the final inspection.
      (4)   Post closure inspection. The Solid Waste Coordinator shall inspect the CDDL no less than two years following closure of the facility. The inspection will focus on the integrity of the cap and stormwater diversion system as well as any other feature associated with the CDDL. This inspection approval is required before the guarantee deposit can be released.
(Ord. KOC 97-830-53, passed 9-2-1997; Ord. KOC 99-830-199, passed 6-1-1999)