(a) When a proposed development involves an area equal to or more than one acre of earth-disturbing activities, the owner shall develop and submit a Stormwater Pollution Prevention Plan to the Office of the City Engineer for review and approval.
(b) For development involving less than one acre of earth-disturbing activities, which is part of a larger common plan of development that has or will disturb one or more acres of land, the owner shall develop and submit a Stormwater Pollution Prevention Plan to the Office of the City Engineer for review and approval.
(c) Permit application forms shall be made available from the Public Works Department. Information required shall be sufficient for the Department to determine that the Stormwater Pollution Prevention Plan is in compliance with the requirements of the OEPA Construction General Permit. At a minimum, the Stormwater Pollution Prevention Plan shall include the following:
(1) Name, address and phone number of property owner, the Stormwater Pollution Prevention Plan designer and the person responsible for implementing the Plan during construction.
(2) Location of the activity
(3) Description of the activity
A. Type of activity
B. Location by address and by permanent parcel number(s)
C. The size of the parcel(s) on which the activity will occur and the size of the area to be disturbed
D. Project duration including anticipated start and completion dates
E. A site map, drawn to scale, including but not limited to:
1. Project boundaries
2. Grading Plan at 1' contour intervals with direction of flow arrows
3. Public and/or Private Stormwater Infrastructure on and adjacent to the site
F. Structural and Non-Structural Best Management Practices to be implemented during construction
G. Post-construction Structural and Non-Structural Best Management Practices
H. A copy of the Construction General Permit Notice of Intent submitted to the Ohio Environmental Protection Agency
(4) The Public Works Department reserves the right to request such additional information as may be necessary to ensure that the Stormwater Pollution Prevention Plan meets the requirements of the OEPA Construction General Permit.
(5) No permit shall be required for earth-disturbing activities which have been provided for in a Stormwater Pollution Prevention Plan approved before the effective date of this Ordinance.
(6) No permit shall be required for farming activities regulated by, and in compliance with, the Ohio Agricultural Sediment Pollution Abatement Rules.
(Ord. 19-62 AC CMS. Passed 11-18-19.)