The fee for a plumbing permit shall be paid, based on the following computations:
(a) New installations or additions to existing system in such amount as provided by ordinance. If wiring is required a separate electrical permit is to be obtained.
(b) Repair or replacement of fixtures, soil, or waste line and hot water heaters, in such amount as provided by ordinance.
(Ord. 1733AC CMS. Passed 12-5-83.)
(c) Fixtures moved more than four feet from their original location shall be classified as installation of new fixtures.