Removal of the alternative energy system shall include the removal of the entire structure, including foundations, transmission/interconnection equipment. Failure to remove the alternative energy system shall be deemed a violation of this subchapter and shall be handled in the same manner as other nuisances, § 93.40, Property Maintenance (Ordinance No. 15-2009) of this Code.
(Ord. 05-2011, passed 5-2-11; Am. Ord. 09-2022, passed 12-5-22)