§ 95.44 CONSTRUCTION MEANS AND METHODS.
   (A)   Standards and requirements for particular types of construction methods.
      (1)   Boring or jacking.
         (a)   Pits and shoring. Boring or jacking under rights-of-way shall be accomplished from pits located at a minimum distance specified by the Public Services Director from the edge of the pavement. The permittee shall verify the locations of all city utilities by actual digging and exposing at each and every crossing and at intervals of 200 feet where lines run parallel with the proposed installation. Pits for boring or jacking shall be excavated no more than 48 hours in advance of boring or jacking operations and backfilled within 48 hours after boring or jacking operations are completed. While pits are open, they shall be clearly marked and protected by barricades. Shoring shall be designed, erected, supported, braced, and maintained so that it will safely support all vertical and lateral loads that may be imposed upon it during the boring or jacking operation.
         (b)   Wet boring or jetting. Wet boring or jetting shall not be permitted under the roadway.
         (c)   Borings with diameters greater than six inches. Borings over six inches (0.15m) in diameter shall be accomplished with an auger and following pipe, and the diameter of the auger shall not exceed the outside diameter of the following pipe by more than one inch (25mm).
         (d)   Borings with diameters six inches or less. Borings of six inches or less in diameter maybe accomplished by either jacking, guiding with auger, or auger and following pipe method.
         (e)   Tree preservation. Any facility located within the drip line of any tree designated by the city to be preserved or protected shall be bored under or around the root system.
      (2)   Trenching. Trenching for facility installation, repair, or maintenance on rights-of-way shall be done in accordance with the applicable portions of § 603 of IDOT's Standard Specifications for Road and Bridge Construction.
         (a)   Length. The length of open trench shall be kept to the practicable minimum consistent with requirements for pipe-line testing. Only one-half of any intersection may have an open trench at any time unless special permission is obtained from the Public Services Director.
         (b)   Open trench and excavated material. Open trench and windrowed excavated material shall be protected as required by Chapter 6 of the Illinois Manual on Uniform Traffic Control Devices. Where practicable, the excavated material shall be deposited between the roadway and the trench as added protection. Excavated material shall not be allowed to remain on the paved portion of the roadway. Where right-of-way width does not allow for windrowing excavated material off the paved portion of the roadway, excavated material shall be hauled to an off-road location. If the right-of-way width is insufficient to hold the excavated material without using part of an adjacent sidewalk, bike path or other type of pedestrian pathway, the permittee shall keep a passageway at least one-half the sidewalk width open. In order to expedite the flow of traffic or to abate a dirt or dust nuisance, the Public Services Director may require that the permittee provide toe-boards or lines; and if the excavated area is muddy and causes inconvenience to pedestrians, temporary wooden plank walls shall be installed by the permittee as directed by the Public Services Director.
         (c)   Drip line of trees. The permittee shall not trench within the drip line of any tree designated by the city to be preserved.
      (3)   Backfilling.
         (a)   Any pit, trench, or excavation created during the installation of facilities shall be backfilled for its full width, depth, and length, using methods and materials in accordance with IDOT's Standard Specifications for Road and Bridge Construction. When excavated material is hauled away or is unsuitable for backfill, suitable granular backfill shall be used.
         (b)   No backfilling shall be permitted where city utilities are exposed until inspected by the city.
         (c)   Minimum cover for all backfilling of water lines shall be five feet in depth.
         (d)   For a period of three years from the date construction of a facility is completed, the permittee shall be responsible to remove and restore any backfilled area that has settled due to construction of the facility. If so ordered by the Public Services Director, the permittee, at its expense, shall remove any pavement and backfill material to the top of the installed facility, place and properly compact new backfill material, and restore new pavement, sidewalk, curbs, and driveways to the proper grades, as determined by the Public Services Director.
      (4)   Pavement cuts. Pavement cuts for facility installation or repair shall be permitted on a highway only if that portion of the highway is closed to traffic. If a variance to the limitation set forth in this division is permitted under § 95.49, the following requirements shall apply:
         (a)   Any excavation under pavements shall be backfilled and compacted as soon as practicable with granular material of CA-6 to CA-10 gradation, as designated by the Public Services Director.
         (b)   Restoration of pavement, in kind, shall be accomplished as soon as practicable, and temporary repair with bituminous mixture shall be provided immediately. Any subsequent failure of either the temporary repair or the restoration shall be rebuilt upon notification by the city.
         (c)   All saw cuts shall be full depth.
         (d)   For all rights-of-way which have been reconstructed with a concrete surface/base in the last seven years, or resurfaced in the last three years, permits shall not be issued unless such work is determined to be an emergency repair or other work considered necessary and unforeseen before the time of the reconstruction or unless a pavement cut is necessary for a J.U.L.I.E. locate.
      (5)   Encasement.
         (a)   Casing pipe shall be designed to withstand the load of the highway and any other superimposed loads. The casing shall be continuous either by one-piece fabrication or by welding or jointed installation approved by the city.
         (b)   The venting, if any, of any encasement shall extend to no more than one foot (0.3m) inside the right-of-way line. No above-ground vent pipes shall be located in the area established as clear zone for that particular section of the highway.
         (c)   In the case of water main or service crossing, encasement shall be furnished between bore pits unless continuous pipe or jointed pipe approved by the city is used under the roadway. Casing may be omitted only if pipe is installed prior to highway construction and carrier pipe is continuous or mechanical joints are of a type approved by the city. Bell and spigot type pipe shall be encased regardless of installation method.
         (d)   In the case of gas pipelines of 60 psig or less, encasement may be eliminated.
         (e)   In the case of gas pipelines or petroleum products pipelines with installations of more than 60 psig, encasement maybe eliminated only if:
            1.   Extra heavy pipe is used that precludes future maintenance or repair; and
            2.   Cathodic protection of the pipe is provided;
         (f)   If encasement is eliminated for a gas or petroleum products pipeline, the facility shall be located so as to provide that construction does not disrupt the right-of-way.
      (6)   Minimum cover of underground facilities. Cover shall be provided and maintained at least in the amount specified in the following table for minimum cover for the type of facility:
 
TYPE OF FACILITY
MINIMUM COVER
Electric lines
30 inches (0.8 m)
Communication, cable or video service
18 to 24 inches (0.6m, as determined by the city)
Gas or petroleum products
30 inches (0.8m)
Water line
5 feet (1.5m)
Sanitary sewer, storm sewer, or drainage line
Sufficient cover to provide freeze protection
 
   (B)   Standards and requirements for particular types of facilities.
      (1)   Electric power or communication lines.
         (a)   Code compliance. Electric power or communications facilities within city rights-of-way shall be constructed, operated, and maintained in conformity with the provisions of 83 Ill. Adm. Code Part 305 (formerly General Order 160 of the ILCC) entitled Rules for Construction of Electric Power and Communications Lines, and the National Electrical Safety Code.
         (b)   Overhead facilities. Overhead power or communication facilities shall use single pole construction and, where practicable, surplus space on poles shall be jointly used. Utilities shall make every reasonable effort to design the installation so guys and braces will not be needed. Variances may be allowed if there is no feasible alternative, and if guy wires are equipped with guy guards for maximum visibility.
         (c)   Underground facilities.
            1.   Cable may be installed by trenching or plowing, provided that special consideration is given to boring in order to minimize damage when crossing improved entrances and side roads.
            2.   If a crossing is installed by boring or jacking, encasement shall be provided between jacking or bore pits. Encasement maybe eliminated only if: (i) the crossing is installed by the use of moles, whip augers, or other approved methods which compress the earth to make the opening for cable installation; or (ii) the installation is by the open trench method which is only permitted prior to roadway construction.
            3.   Cable shall be grounded in accordance with the National Electrical Safety Code.
         (d)   Burial of drops. All temporary service drops placed between November 1 of the prior year and March 15 of the current year, also known as snowdrops, shall be buried by May 31 of the current year, weather permitting, unless otherwise permitted by the city. Weather permitting, utilities shall bury all temporary drops, excluding snowdrops, within ten business days after placement.
      (2)   Underground facilities other than electric power or communication lines. Underground facilities other than electric power or communication lines may be installed by:
         (a)   The use of moles, whip augers, or other approved methods which compress the earth to move the opening for the pipe;
         (b)   Jacking or boring with vented encasement provided between the ditch lines or toes of slopes of the highway;
         (c)   Open trench with vented encasement between ultimate ditch lines or toes of slopes, but only if prior to roadway construction; or
         (d)   Tunneling with vented encasement, but only if installation is not possible by other means.
      (3)   Gas transmission, distribution and service. Gas pipelines within rights-of-way shall be constructed, maintained, and operated in a city-approved manner and in conformance with the Federal Code of the Office of Pipeline Safety Operations; Department of Transportation, Part 192 - Transportation of Natural and Other Gas by Pipeline; Minimum Federal Safety Standards (49 C.F.R. § Part 192); IDOT's Standard Specifications for Road and Bridge Construction, and all other applicable laws, rules, and regulations.
      (4)   Petroleum products pipelines. Petroleum products pipelines within rights-of-way shall conform to the applicable sections of ANSI Standard Code for Pressure Piping. (Liquid Petroleum Transportation Piping Systems ANSI-B 31.4).
      (5)   Waterlines, sanitary sewer lines, storm water sewer lines or drainage lines. Water lines, sanitary sewer lines, storm sewer lines, and drainage lines within rights-of-way shall meet or exceed the recommendations of the current Standard Specifications for Water and Sewer Main Construction in Illinois and the city's Public Works and Water Construction Standards.
      (6)   Ground mounted appurtenances. Ground mounted appurtenances to overhead or underground facilities, when permitted within a right-of-way, shall be provided with a vegetation-free area extending one foot (305mm) in width beyond the appurtenance in all directions. The vegetation-free area may be provided by an extension of the mounting pad, or by heavy duty plastic or similar material approved by the Public Services Director. With the approval of the Public Services Director, shrubbery surrounding the appurtenance may be used in place of vegetation-free area. The housing for ground mounted appurtenances shall be painted a neutral color to blend with the surroundings.
   (C)   Materials.
      (1)   General standards. The materials used in constructing facilities within rights-of-way shall be those meeting the accepted standards of the appropriate industry, the applicable portions of IDOT's Standard Specifications for Road and Bridge Construction, the requirements of the ILCC, or the standards established by other official regulatory agencies for the appropriate industry.
      (2)   Material storage on right-of-way. No material shall be stored on the right-of-way without the prior approval of the city. When such storage is permitted, all pipe, conduit, wire, poles, cross arms, or other materials shall be distributed along the right-of-way prior to and during installation in a manner to minimize hazards to the public or an obstacle to right-of-way maintenance or damage to the right-of-way and other property.
      (3)   Hazardous materials. The plans submitted by the permittee to the city shall identify any hazardous materials that may be involved in the construction of the new facilities or removal of any existing facilities.
   (D)   Operational restrictions.
      (1)   The city may, in its sole discretion, require that construction operations on rights-of-way be discontinued or restricted when such operations would create hazards to traffic or the public health, safety, and welfare, or when conditions are such that construction would result in extensive damage to the rights-of-way or other property.
      (2)   These restrictions may be waived by the Public Services Director when emergency work is required to restore vital services.
      (3)   No opening or excavation in any right-of-way shall extend beyond the centerline of the roadway before being backfilled or before the surface of the street is temporarily restored, and no more than 250 feet measured longitudinally shall be opened in any right-of-way at any one time unless the roadway has been completely closed to traffic or unless the city has given specific written permission for an exception to this restriction.
      (4)   Work authorized by a permit shall be performed between the hours of 7:00 a.m. and 6:00 p.m., Monday through Friday and between 9:00 a.m. and 5:00 p.m. on Saturdays and no work on Sunday, unless the permittee obtains written consent from the Engineer or Public Services Director to perform work at an earlier or later hour; provided, however, that such work shall not be performed on any state, federal or designated city holiday. Such permission shall be granted only in a case of an emergency, or in the event that the work authorized by the permit has to be performed in a traffic-congested area.
      (5)   In no case shall any officer or employee of the city be deemed to have taken charge or care of any street opening, and no such officer or employee is authorized in any way to take or assume any jurisdiction over any such opening except in the exercise of police power when it is necessary to protect life and property.
   (E)   Location of existing facilities. Any applicant proposing to construct facilities in the city shall contact J.U.L.I.E. and ascertain the presence and location of existing above-ground and underground facilities within the rights-of-way to be occupied by its proposed facilities. The city will make its permit records available for the purpose of identifying possible facilities; however, due to the age and material of certain lines and the inaccuracy of as-built drawings, the city cannot guarantee the accuracy of the field locates and the permittee shall verify the location of all lines. When notified of an excavation, or when requested by the city or by J.U.L.I.E, a permittee shall locate and physically mark its underground facilities within 48 hours, excluding weekends and holidays, in accordance with the Illinois Underground Facilities Damage Prevention Act, ILCS Ch. 220, Act 50, §§ 1 et seq.
(Ord. 07-18, passed 10-23-07; Am. Ord. 08-13, passed 8-12-08)