(a) The permittee of any special street privilege may be required at any time on 30 days notice by the City to make any necessary change in the construction or location of a permitted use which may be required in connection with street widening or other change of street uses by the City, or in connection with the authorized location or change of location of public utility service lines, pipes, poles or other equipment.
(b) If the permittee shall fail to make the required change in accordance with the order of the City, the City shall have the authority to make the change and charge the cost to the permittee or, in the case of privately owned public utility company, the City shall authorize such company to make the change and the permittee shall be liable for the reasonable cost thereof.
(Ord. 95-2000. Passed 12-26-00.)