909.03 CONTRACTOR TO MAKE REPAIRS; FAILURE TO COMPLY.
   Upon completion of the work authorized by the permit granted by compliance with the provisions of this chapter, the contractor shall make such temporary repairs as are necessary to maintain traffic and shall promptly repair the roadway and/or curbing as soon as possible. In the event the contractor fails to make such repairs within ten days after notice from the City, the City may cause such repairs to be made and the cost deducted from the deposits required by Section 909.01.
(Ord. 2013-42. Passed 6-25-13.)