8-2-1: PERMIT FEES:
The following fees shall be charged for permits for certain buildings, structures or work regulated by this title:
Contractor
Homeowner
Contractor
Homeowner
Examination Of Plans:
 
 
Single-family
Actual cost
Actual cost
Multi-family
Actual cost
Actual cost
Commercial
Actual cost
Actual cost
Industrial
Actual cost
Actual cost
Residential Construction – New:
Single-family residence
0–800 square feet
$100.00
$100.00
801–1,500 square feet
125.00
125.00
Each additional square foot
5.00
5.00
Addition, dormer or 3 season room
Less than 100 square feet
50.00 minimum
50.00 minimum
Each additional square foot
3.00
3.00
Garage and garage additions
Up to 400 square feet
30.00 minimum
30.00 minimum
Each additional 10 square feet
1.00
1.00
Garage slabs
Costing less than $1,000.00
50.00
25.00
Each additional $1,000.00
10.00
5.00
Miscellaneous:
Driveways - asphalt, concrete and brick pavers
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Sidewalks, patio - concrete and brick pavers
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Siding, soffit, gutters, etc.
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Roofing
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Replacement windows and doors
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Porches and decks
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Miscellaneous
 
 
Costing less than $1,000.00
50.00 minimum
25.00 minimum
Each additional $1,000.00
10.00
5.00
Fence
50.00
25.00
Shed
25.00
10.00
Swimming pools
50.00
25.00
Condominium Construction - New:
2 and 3 unit condo building - per unit
100.00
Each additional unit
75.00
Commercial Construction - New:
First 30,000 cubic feet
300.00 minimum
Each additional 10,000 cubic feet or fraction thereof
50.00
Over 500,000 cubic feet
25.00
 
Addition or accessory building
Up to 20,000 cubic feet
150.00 minimum
 
Each additional 10,000 cubic feet over 20,000 cubic feet
50.00
 
Industrial Construction - New:
First 3,000 square feet
300.00 minimum
 
Next 497,000 square feet/per 1,000 square feet
40.00
 
Next 500,000 square feet/per 1,000 square feet
20.00
 
All over 1,000,000 square feet/ per 1,000 square feet
10.00
 
Alteration Or Remodeling Or Fire Repair - All Buildings Or Structures:
Costing less than $1,000.00
50.00 minimum
 
Each additional $1,000.00
10.00
 
Underground Tanks Installation:
Costing less than $1,000.00
100.00 minimum
 
Each additional $1,000.00
25.00
 
Tank Testing:
Each tank
50.00
 
Moving, Raising, Shoring Or Underpinning Of Structure:
For each 1,000 cubic feet of volume or fractional part
2.00
 
Minimum charge
100.00
 
Wrecking:
For the first 25,000 cubic feet of volume
125.00
 
For each additional 25,000 cubic feet of volume or fraction thereof
20.00
 
 
(Ord. O-24-2004, 12-6-2004)
Construction must be started under each permit within thirty (30) days after date of issuance, and if such construction is not started, the permit shall be void and the amount paid shall not be refunded. (Ord. O-17-93, 5-17-1993)
Each applicant shall provide on the permit, the date by which all construction shall be started and the date it will be completed. The completion date shall not exceed twelve (12) months after the starting date. If construction is not completed by said completion date, the applicant shall apply to the chief building official for an extension. An extension fee of one-half (1/2) of the original permit fee shall be required upon approval of the extension. Approval of an extension will not unreasonably be withheld by the chief. (Ord. O-17-93, 5-17-1993; amd. Ord. O-36-97, 8-18-1997, eff. 12-1-1997)