727.04 OPERATING REQUIREMENTS.
   In addition to the requirements set forth in Sections 727.02 and 727.03, all wells shall comply with the following:
   (a)    All equipment shall be muffled to minimize noise impacts on adjacent properties.
   (b)    Lights shall be shielded to prevent glare onto residential properties.
   (c)    Notice shall be given to the Fire Department prior to any burn-off. Fire extinguishers shall be maintained on the site during drilling or burn-off operations.
   (d)    No equipment or material which is not required for the daily operation of the well shall be stored on the site.
   (e)    Any producing equipment at the wellhead or the storage tanks shall be surrounded by a dike equal to thirty feet by sixty feet by three feet. Such dike shall not be breached.
   (f)   A culvert pipe shall be installed prior to constructing a driveway and shall be approved by the Street Commissioner. The pipe shall be a minimum of twelve inches in diameter and a minimum of forty feet in length.
   (g)    All waste products produced while drilling shall be contained in surface containers or double lined pits and shall be disposed of properly.
   (h)   No propane or liquefied petroleum gas shall be used on drilling sites, unless approved by the Fire Department.
   (i)    In addition, the Fire Department may impose other regulations concerning burn-off of by-products and/or the safety and health of residents of the Village.
   (j)    Plugging and/or capping of wells shall be done in accordance with Ohio R.C. Chapter 1509.
   (k)    A permanent sign (a minimum of twenty-four inches by twelve inches) shall be posted at the entrance to the well site. The sign shall contain the property owner's name, the well owner's name, emergency telephone numbers and the State permit number.
   (l)    All equipment and vehicles shall be free of mud prior to entering on a roadway so that no deposit is left on the roadway. Any deposit left on the roadway shall be immediately removed.
   (m)    No brine shall be disbursed on any Village roadway without the express consent of the Street Commissioner.
   (n)    Upon completion of all drilling operations and the removal of all mobile equipment, the permit holder shall notify the Street Commissioner who will inspect the site and the adjacent roadway. Any roadway damage attributable to the drilling operation or the egress of the drilling equipment shall be repaired at the owner/operator's expense. The roadway shall be returned to a condition substantially the same as before commencement of the drilling operation.
   (o)    Upon acceptance by the Street Commissioner of the roadway condition and/or repair, the bond required in this chapter shall be released.
      (Ord. 143.437. Passed 9-4-84.)