(A) Description. The work of this section includes the supply of all materials, labor and equipment required to construct all streets and roads.
(B) Quality assurance. All materials used shall be new, of minimum quality as specified herein. Material testing and certification documents shall be made available to the town or its agents upon request. This information shall include, but not be limited to, materials testing reports, gradation analysis and manufacturers’ certifications.
(2004 Code, Art. V, § A, part 1)