(A) Before installing piping, the contractor shall carefully verify location depth type of joint needed and size of pipe to which connection is proposed. The contractor shall assure that the lines can be run as contemplated without interfering with footings, walls, other piping, fixtures and the like.
(B) All lengths of pipe shall be dimensioned accurately to measurements established at the site and shall be worked into place without springing or forcing. Cut sections of pipe shall be reamed to remove all burrs.
(C) Utmost care shall be exercised in transporting and handling all pipe, fittings, valves and the like, in order to avoid shock and damage to pipe and coatings. Lifting shall be by joist or skids when hand lifting is not feasible. Dropping of the pipe will not be permitted. Pipe handled on sideways must not be skidded or rolled against pipe already on the ground. Damaged or defective pipe and appurtenances shall be replaced.
(D) The pipe shall be thoroughly cleaned before being laid and kept clean during construction.
(E) The contractor shall cut all pipe and drill all holes that may be necessary.
(2004 Code, Art. IV, § A, part 3)