§ 51.063 CONTROL MANHOLE.
   (A)   Any person who is discharging industrial waste into the sanitary sewerage system shall provide reasonable access, means and facilities for the purpose of permitting the convenient observations, measurements and sampling of such industrial waste. If such access, means and facilities are not otherwise available such person shall construct and maintain an accessible and safe control manhole on the waste line or lines for such purposes.
   (B)   Any person proposing to discharge industrial waste in quantities greater than 25,000 gallons per day (GPD), or with strengths equivalent to 25,000 gallons per day (GPD) of domestic wastewater, shall provide a control manhole in accordance with the requirements of the town.
   (C)   The Public Utilities Director shall determine if an automatic sampling station is required. If it is required, it shall be constructed in such a manner so as to be easily accessed by the town at any time. The sampler shall operate in a flow proportional mode. The sampling station shall be located at a mutually agreeable point between representatives of the industry and the Public Utilities Director. The operation and maintenance of the sampling station shall be the responsibility of the industry. Samples shall be split with the industry upon request.
(Ord. passed 5-3-2011; Ord. passed 9-11-2014)