(A) All water main extensions shall be constructed according to the latest version of the Rules Governing Public Water Systems, NCAC Title 15a, Subchapter 18c, §§ .0100 through .2100 as amended by the state.
(B) In addition to the above, all extensions and water services shall also conform to the specifications of the American Waterworks Association (AWWA), the American Society of Testing Engineers (ASTM) and other such nationally recognized standards organizations as should apply.
(C) All new water mains shall be cleaned by “pigging” prior to disinfection and pressure testing. The exact procedure for each main shall be determined in the field by the Public Utilities Director in consultation with the project engineer. This procedure shall be completed at no cost to the town.
(D) Materials, fittings and equipment shall be as deemed by the Utilities Director so as to match materials and supplies currently in use by the town.
(Ord. passed 5-3-2011; Ord. passed 9-11-2014)