(A) Application for a development permit shall be presented to the Floodplain Administrator on forms furnished by him or her and may include, but not be limited to, plans in duplicate drawn to scale showing the location, dimensions and elevation of proposed landscape alterations, existing and proposed structures, including the placement of manufactured homes, and the location of the foregoing in relation to areas of special flood hazard. Additionally, the following information is required:
(1) Elevation, in relation to mean sea level, of the lowest floor, including basement, of all new and substantially improved structures;
(2) Elevation in relation to mean sea level to which any non-residential structure shall be flood-proofed;
(3) A certificate from a registered professional engineer or architect that the non- residential flood-proofed structure shall meet the flood-proofing criteria of § 152.26(B) of this chapter;
(4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development;
(5) Maintain a record of all information in accordance with § 152.41(A)(1) of this chapter; and
(6) As applicable, all floodplain development permit applications shall contain a certificate of no-rise, a final FEMA elevation certificate and/or a floodproofing certificate if development is in the SFHA.
(7) Floodplain development permits will be processed upon receipt of a $100 application fee.
(B) Approval or denial of a development permit by the Floodplain Administrator shall be based on all of the provisions of these regulations and the following relevant factors:
(1) The danger to life and property due to flooding or erosion damage;
(2) The susceptibility of the proposed facility and its contents to flood damage and the effect of the damage on the individual owner;
(3) The danger that materials may be swept onto other lands to the injury of others;
(4) The compatibility of the proposed use with existing and anticipated development;
(5) The safety of access to the property in times of flood for ordinary and emergency vehicles;
(6) The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical and water systems;
(7) The expected heights, velocity, duration, rate of rise and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site;
(8) The necessity to the facility of a waterfront location, where applicable;
(9) The availability of alternative locations not subject to flooding or erosion damage, for the proposed use; and
(10) The relationship of the proposed use to the Comprehensive Plan for that area.
(2002 Code, § 152.42) (Ord. 340, passed 6-12-1995; Ord. 609, passed 10-8-2007; Ord. 613, passed 11-13-2007; Ord. 962, passed 2-12-2024)