931.19 CONSTRUCTION PERMIT.
   (a)   Facilities Operators are required to obtain a construction permit pursuant to Section 931.07 including, but not limited, to the construction bond set forth in Subsection 931.07(g), prior to commencing any of the following activities:
      (1)   Collocation of small cell equipment on a Wireless Support Structure;
      (2)   Replacement, modification, repair, or maintenance of small cell equipment;
      (3)   Construction, replacement, modification, repair, or maintenance of a Wireless Support Structure associated with a small cell facility; and
      (4)   Any excavation of the Right-of-Way in connection with the activities described in this Section.
         (Ord. 2022-43. Passed 6-7-22.)