1313.15 HEATING, REFUSE BURNING AND VENTILATION DUCT FEES FOR ALTERATION.
   Fees for the examination of plans and applications for the issuance of permits, and the original inspection and certificate of operation for the construction, installation, reconstruction or alteration of any process, fuel-burning, refuse-burning or ventilation duct equipment are as follows:
 
Fee
(a)
Process and Fuel-Burning Equipment for Each Unit
 
 
(Rated Input Capacity in BTU or Equivalent)
 
   
 
Up to 50,000
$ 50.00   
 
50,000 up to 250,000
75.00
 
250,001 up to 500,000
100.00
 
500,001 up to 2,500,000
125.00
 
2,500,001 up to 10,000,000
175.00
 
10,000,001 up to 100,000,000
225.00
 
Over 100,000,000
325.00
 
 
Fee
(b)
Ventilation Ducts
 
 
For first 100 square feet or fraction thereof
50.00
   
 
For each additional 100 square feet of floor area served
5.00
(c)
Refuse Burning Equipment For Each Unit
 
 
(Primary furnace volume in cubic feet)
 
 
Less than 6
50.00
 
6 to 49
100.00
 
50 or more
125.00
(d)
Process Equipment
 
 
Each installation, liquid or gas
100.00
 
(see ventilation duct for exhaust facilities.)
 
(e)
Factory Built Fireplaces and Stoves
 
 
For each installation
50.00
(f)
Air Handler
50.00
(g)
Gas Logs
50.00
(h)
Wood Burning Unit
50.00
(Ord. 2018-21. Passed 4-17-18.)