CHAPTER 1361
Riparian Setbacks and Wetland Setbacks
1361.01   Comprehensive Storm Water Management Plan.
1361.02   Purpose.
1361.03   Disclaimer of liability.
1361.04   Conflicts, severability, nuisances and responsibility.
1361.05   Effective date.
1361.06   Scope.
1361.07   Consultations.
1361.08   Riparian and wetland setback requirements.
1361.09   Establishment of designated watercourses and riparian setbacks.
1361.10   Establishment of wetland setbacks.
1361.11   Procedure for wetland setbacks.
1361.12   Uses permitted in riparian and wetland setbacks.
1361.13   Uses prohibited in riparian and wetland setbacks.
1361.14    Nonconforming structures or uses in riparian and wetland setbacks.
1361.15   Variances within riparian and wetland setbacks.
1361.16   Boundary interpretation and appeals procedure.
1361.17   Inspection of riparian and wetland setback.
1361.18   Definitions.
1361.19   Violations.
1361.99   Penalty.
 
CROSS REFERENCES
Construction site soil erosion, sediment and storm water runoff - BLDG. Ch. 1357
Post-construction water quality runoff - see BLDG. Ch. 1359