§ 153.171 SETBACK AND YARD MEASUREMENTS, BUILDABLE AREA.
   (A)   General setback and yard measurements. The required front, side and rear setbacks (yards) for individual properties, as set forth for the particular zoning district within which a given property is located, shall be measured inward toward the center of said property from all points along the front, side and rear property lines of the property. Once the required yard areas of a given lot have been established, the remaining area of the lot which is not included in any required front, side or rear lot shall be known as the buildable area within which the approved structure(s) shall be placed. Where a property abuts a street right-of-way or access easement, the setback shall be measured from the edge of the right-of-way line or access easement.
 
   (B)   Setback measurement on cul-de-sacs. The front setback for lots on cul-de-sacs shall be measured parallel to the arc of the street right-of-way and inward toward the center of the lot, as illustrated in the following diagram.
 
(Ord. 06-11-16, passed 9-21-2016)