§ 93.05 PLANS AND SPECIFICATIONS.
   (A)   All sidewalks shall be constructed in compliance with the plans therefor and with the standard specifications of the city.
   (B)   All concrete used in sidewalk construction shall, 28 days after placement, be capable of resisting pressure of 2,500 pounds per square inch, without failure.
(Prior Code, § 1020.05)