The commission may require the subdivider, as a condition of approval of a tentative map, to grant easements not less than ten feet in width along each side of the rear lot line, and not less than five feet in width along each side of the side lot lines for drainage, public utility, and sanitary sewer purposes. Easements of lesser width(s) may be allowed when approved by the city engineer, after conferring with the affected public utility system(s).
(Ord. 182 § 2 (part), 1997)