Where soil or construction materials are moved on public roadways from or to the site of a grading operation, a haul route shall be approved by the city engineer in accordance with the provisions of Subarticle 3.9 of the Grading Manual. Deviation from the designated haul route shall constitute a violation of the conditions of the permit issued under this chapter. Vehicular track-out shall be controlled, as directed by the city engineer, to prevent sediment deposit outside of the project site boundaries.
(Ord. 349 § 4 (part), 2006: Ord. 346 § 4 (part), 2006)