§ 50.018 USE OF WATER FOR BUILDING PURPOSES TO BE METERED; METER DEPOSIT.
   (A)    Water for building or construction purposes will be furnished by meter measurement after a suitable deposit has been made, the minimum deposit shall be $10. The amount of the deposit shall be determined by the city based on the size of the construction work contemplated. All water for building or construction purposes, as set forth in the permit, must pass through one and the same meter.
   (B)    Water so supplied shall be discharged through a hose or pipe directly on the material to be made wet, or into a barrel or other container, and in no case upon the ground or into or through a ditch or trench. All use of water by other than the applicant, or use of water for any purpose or upon any premises not so stated or described in the application, must be prevented by the applicant, or water service may be discontinued to the applicant without notice.
(Ord. 120, passed 3-12-73) Penalty, see § 50.999