§ 154.05 NOTIFICATION TO BUILDING INSPECTOR.
   (A)   The Building Inspector shall be notified by the firm or person doing the work when any plumbing work is begun and when it is ready for inspection. The Building Inspector shall cause all inspections to be made, except inspections of taps for sewer or water, which inspections will be caused to be made by the Director of Public Works, all of said inspections to be made by a licensed plumber. All work shall be left uncovered and convenient for examination until inspected and approved. If such work shall not be left uncovered and convenient for inspection, the Building Inspector, the Director of Public Works, or their respective designee is hereby authorized to require such excavation as shall be necessary to make the inspection.
   (B)   The inspection shall be made within one day after receipt of notice that the work is ready for inspection. All plumbing must be tested as provided by law in the presence of the inspector, and all defective materials and work replaced and corrected. Upon satisfactory completion of the work, the Building inspector or Director of Public Works as applicable shall issue a Certificate of Approval.
(Prior Code, Art. 15, § 15.5)