Section
53.01 Purpose
53.02 Conflicting ordinances
53.03 Compliance with other ordinances
53.04 Definitions
53.05 Storm water control policy
53.06 Permits for construction in the floodway
53.07 Information requirements
53.08 Determination of runoff quantities
53.09 Amount of runoff to be accommodated by various parts of drainage facility
53.10 Level of protection for urban areas
53.11 Storm sewer design standards
53.12 Workmanship and materials
53.13 Open channel design standards
53.14 Construction and materials
53.15 Storm water detention
53.16 Certifications required
53.17 Changes in plan
53.18 Determination of impact drainage areas
53.19 Other requirements
53.20 Regional drainage plans
53.21 Disclaimer of liability
53.22 Corrective action
53.23 Exempt projects
Appendix A: Tables and Figures