(A) After completion of the project and before final approval and acceptance can be made, an “As Built” set of plans prepared and certified by a professional engineer shall be submitted to the Council for review. These plans shall include all pertinent data relevant to the completed storm drainage system and shall include:
(1) Pipe size and pipe material.
(2) Invert elevations.
(3) Top rim elevations.
(4) Lengths of all pipe structures.
(5) Data and calculations showing detention basin storage volume.
(6) Certified statement on plans stating the completed storm drainage system substantially complies with construction plans as approved by the Council.
(B) All such submitted plans shall be reviewed for compliance by the Engineer or other City designee. Upon approval of the submitted plans, such approval shall be evidenced in writing to the person submitting the plans.
(Prior Code, Art. 20, § 20-16)