1119.09 MINIMUM LENGTHS.
   All improvements as described in this chapter shall be constructed in lengths of not less than 400 feet as part of a single project, unless the Village Engineer, for good cause shown, shall authorize the construction improvements of a lesser length.
(Ord. 1222. Passed 12-16-91.)