The conditions under which permits shall be issued under this chapter are as follows:
(a) A review of the impacts to erosion, stream sedimentation, storm water runoff, streams and wetlands.
(b) A permit for the cutting of trees shall not be issued by the Building Inspector in any case where such cutting of trees would result in interference with the natural water supply of the Village or any of the lots or lands therein, or if it would result in the undue erosion of the soil on such lots or lands.
(c) A permit for the cutting of trees shall require that each tree be cut to within twelve inches of grade, or as close thereto as reasonably possible, and all of the cordwood branches, brush, rubble and refuse resulting therefrom will be removed from the premises or cut up, chipped and placed on the forest floor in such a way that no fire hazard shall result therefrom. A follow-up inspection by the Building Inspector shall be completed to assure the Village of such compliance.
(d) The bond hereinabove provided for shall be signed by the owner of the premises concerned and by each of the persons with whom arrangements have been made for the commercial cutting of the trees under contract or otherwise as principals, and by such sureties as the Building Inspector shall deem sufficient. Any permit granted shall be valid for a period of 90 days.
(Ord. 2018-10. Passed 5-9-18.)