Prior to commencing work, the permittee shall mark, identify and shut off all utilities, including electric, telephone, water, and gas, for each structure and utility lines shall be removed from the building in accordance with the requirements of this chapter and the utility companies involved. All sewer connections from the demolished building shall be bulkheaded at a point specified by the Village Engineer. It is the responsibility of the permittee to see that an inspector from the Village Engineer is present at the time of bulkheading the sewer connections. Any damage done to any curb, pavement, water connections, gas mains, telephone ducts, power ducts or any public utility not mentioned, in the street's right of way during the sewer connection bulkheading operation, is the responsibility of the permittee and must be replaced or repaired at no cost to the Village. Any repair or replacement of the above-mentioned items must be done to the satisfaction of the utility and the Village.
(Ord. 2012-37. Passed 5-9-12.)