1337.04 PERMITS.
   A building permit shall be obtained from the Inspector of Buildings upon providing him with such plans and specifications as may be reasonably required to show the location of the proposed lighting and materials, after payment of the fee required for an electrical permit for a new family dwelling under Section 1313.22(a)(3), without additional payment based on area.
(Ord. 1982-57. Passed 6-8-83.)