903.03 PERMIT APPLICATION TYPES.
   Applicants shall classify their Application as one of the following types:
   (a)   Type 1: Eligible Facilities Requests.
   (b)   Type 2: Application for Collocation of Small Cell Equipment on a Wireless Support Structure that is not an Eligible Facilities Request.
   (c)   Type 3: New Wireless Support Structure. Such applications will address construction, modification, replacement, or removal of a Wireless Support Structure within the Right-of-Way. At the time of Application, Applicants shall certify that Small Cell Equipment will be placed on the Wireless Support Structure within 180 days from the date the Small Cell Use Permit is issued.
   (d)   For Type 2 and Type 3 Applications, Applicants shall indicate whether the Application does or does not include or relate to a Small Wireless Facility.
      (1)   If an application involves a Small Wireless Facility, any related required permits will be issued within the designated review period set forth below, if complete applications for such permits are filed no later than the application for the Small Cell Facilities Use Permit.
         (Ord. 2020-38. Passed 6-10-20.)