(A) Permit issuance. If the applicant has satisfied the requirements of this subchapter, the city shall issue a permit.
(B) Conditions. The city may impose reasonable conditions upon the issuance of the permit and the performance of the applicant thereunder to protect the health, safety, and welfare or when necessary to protect the right-of-way and its current use. In addition, a permittee shall comply with all requirements of local, state, and federal laws, including, but not limited to, M.S. §§ 216D.01 through 216D.09 (Gopher One Call Excavation Notice System), as they may be amended from time to time, and Minn. Rules Ch. 7560.
(Prior Code, § 8-11-10)
(B) Excavation permit fee. The city shall establish an excavation permit fee in an amount sufficient to recover the following costs:
(1) The city management costs; and
(2) Degradation costs, if applicable.
(C) Obstruction permit fee. The city shall establish the obstruction permit fee and shall be in an amount sufficient to recover the city management costs.
(D) Small wireless facility permit fees. The city shall establish the permit fee in an amount sufficient to recover the city management costs or collect the maximum fees authorized by law.
(E) Payment of permit fees. No permit shall be issued without payment of excavation, obstruction, or small wireless facility permit fees. The city may allow applicant to pay the fees within 30 days of billing.
(F) Non refundable. Permit fees that were paid for a permit that the city has revoked for a breach as stated in § 94.21 are not refundable.
(G) Application to franchises. Unless otherwise agreed to in a franchise, management costs may be charged separately from and in addition to the franchise fees imposed on a right-of-way user in the franchise.
(Prior Code, § 8-11-11)
(A) Timing. The work to be done under the excavation permit, and the patching and restoration of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the permittee or when work was prohibited as unseasonal or unreasonable under § 94.16.
(B) Patch and restoration. Permittee shall patch its own work. The city may choose either to have the permittee restore the right-of-way or to restore the right-of-way itself.
(1) City restoration. If the city restores the right-of-way, permittee shall pay the costs thereof within 30 days of billing. If, following the restoration, the pavement settles due to permittee’s improper backfilling, the permittee shall pay to the city, within 30 days of billing, all costs associated with correcting the defective work.
(2) Permittee restoration. If the permittee restores the right-of-way itself, it shall at the time of application for an excavation permit post a construction performance bond in accordance with the provisions of Minn. Rule part 7819.3000.
(3) Degradation fee in lieu of restoration. In lieu of right-of-way restoration, a right-of-way user may elect to pay a degradation fee. However, the right-of-way user shall remain responsible for patching and the degradation fee shall not include the cost to accomplish these responsibilities.
(C) Standards. The permittee shall perform excavation, backfilling, patching and restoration according to the standards and with the materials specified by the city and shall comply with Minn. Rules part 7819.1100.
(D) Duty to correct defects. The permittee shall correct defects in patching or restoration performed by permittee or its agents. The permittee upon notification from the city, shall correct all restoration work to the extent necessary, using the method required by the city. The work shall be completed within five calendar days of the receipt of the notice from the city, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonable or unreasonable under § 94.16.
(E) Failure to restore. If the permittee fails to restore the right-of-way in the manner and to the condition required by the city, or fails to satisfactorily and timely complete all restoration required by the city, the city at its option may do the work. In that event the permittee shall pay to the city, within 30 days of billing, the cost of restoring the right-of-way. If permittee fails to pay as required, the city may exercise its rights under the construction performance bond.
(Prior Code, § 8-11-12)
(A) Joint application. Registrants may jointly apply for permits to excavate or obstruct the right-of-way at the same place and time.
(B) Shared fees. Registrants who apply for permits for the same obstruction or excavation, which the city does not perform, may share in the payment of the obstruction or excavation permit fee. In order to obtain a joint permit, registrants must agree among themselves as to the portion each will pay and indicate the same on their applications.
(C) With city projects. Registrants who join in a scheduled obstruction or excavation performed by the city, whether or not it is a joint application by two or more registrants or a single application, are not required to pay the excavation or obstruction and degradation portions of the permit fee, but a permit would still be required.
(Prior Code, § 8-11-13)
(A) Limitation on area. A right-of-way permit is valid only for the area of the right-of-way specified in the permit. No permittee may do any work outside the area specified in the permit, except as provided herein. Any permittee which determines that an area greater than that specified in the permit must be obstructed or excavated must before working in that greater area:
(1) Make application for a permit extension and pay any additional fees required thereby; and
(2) Be granted a new permit or permit extension.
(B) Limitation on dates. A right-of-way permit is valid only for the dates specified in the permit. No permittee may begin its work before the permit start date or, except as provided herein, continue working after the end date. If a permittee does not finish the work by the permit end date, it must apply for a new permit for the additional time it needs, and receive the new permit or an extension of the old permit before working after the end date of the previous permit. This supplementary application must be submitted before the permit end date.
(Prior Code, § 8-11-14)
(A) Compliance with other laws. Obtaining a right-of-way permit does not relieve permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by the city or other applicable rule, law, or regulation. A permittee shall comply with all requirements of local, state, and federal laws, including, but not limited to, M.S. § 216D.01 through 216D.09 (Gopher One Call Excavation Notice System), as they may be amended from time to time, and Minn. Rules Ch. 7560. A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who does the work.
(B) Prohibited work. Except in an emergency, and with the approval of the city, no right-of-way obstruction or excavation may be done when seasonally prohibited or when conditions are unreasonable for the work.
(C) Interference with right-of-way. A permittee shall not so obstruct a right-of-way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with. Private vehicles of those doing work in the right-of-way may not be parked within or next to a permit area, unless parked in conformance with city parking regulations. The loading or unloading of trucks must be done solely within the defined permit area unless specifically authorized by the permit.
(D) Trenchless excavation. As a condition of all applicable permits, permittees employing trenchless excavation methods, including, but not limited to, horizontal directional drilling, shall follow all requirements set forth in M.S. Ch. 216D, as it may be amended from time to time, and Minn. Rules Ch. 7560 and shall require potholing or open cutting over existing underground utilities before excavating, as determined by the Director.
(Prior Code, § 8-11-15)
The city may deny a permit for failure to meet the requirements and conditions of this subchapter or if the city determines that the denial is necessary to protect the health, safety, and welfare or when necessary to protect the right-of-way and its current use. Denials will be provided in writing and in accordance with statutory requirements.
(Prior Code, § 8-11-16)