If at any stage of the work the Engineer determines that the nature of the formation is such that further work, as authorized by an existing grading permit, may expose to risk any property or public way, the Engineer may immediately order all work to cease, and require as a condition to allowing further work to be done, that such reasonable safety precautions be taken as considered advisable by the Engineer. Special precautions may include but shall not be limited to a flatter exposed slope, construction of additional drainage facilities, slope planting, sprinkler systems, berms, terracing, compaction or cribbing.
(`83 Code, § 15.28.130) (Ord. 85-11 § 1 (part), 1985)