All land reclamation shall meet the following standards:
(A) The smallest amount of bare ground is exposed for as short a time as feasible.
(B) Temporary ground cover is used and permanent ground cover, such as sod, is planted.
(C) Methods to prevent erosion and trap sediment are employed.
(D) Fill is stabilized to accepted engineering standards.
(E) Final slopes for cut slopes should be a maximum of 1:1 or 100%; fill slope of 3:1 or 30%; and grade or construction slope of 5:1 or 20%.