§ 52.33 WATER CUT-OFF VALVE, SEWER CLEAN OUT .
   Effective on the passage of this chapter, all new units and connections will be required to have a water cut-off valve and a sewer clean out valve on a case-by-case basis on the property owner’s side of the water and sewer lines. The owner will be responsible for installation of the water cut-off valve and the sewer clean out. The city will install a cut-off water valve at the meter box on the customer’s side for new and replacement water meters as it deems necessary. The cost of the valve, where installed by the city, will be added to the total installation cost of the water meter.
(Ord. 471, passed 4-13-2004)