APPENDIX C: APPENDIX CONTENTS.
   A.   Design Checklist
   B.   Table X - Perforation Discharge Rates in Gallons per Minute Versus Perforation Diameter and In-Line Pressure
   C.   Table XI - Friction Loss in Schedule 40 Plastic Pipe (Feet of Head Loss per 100 feet)
   D.   Illustrations
(Ord. O-201711-51-031, passed 11-14-2017)